Xiaobian of the manufacturer of automatic terminal machine will explain the operation steps of automatic terminal machine to you. 1. Turn on the power switch of the terminal machine and start using it when the power indicator light is on. 2. Pay attention to whether there is any obvious abnormal sound inside and outside the machine. If there is any suspension of operation, please stop the machine and ask the mechanic to determine whether it needs maintenance. 3. Carefully select the cutter and install the cutter: it shall be operated by designated personnel. Before installing the cutter, it is necessary to manually compare whether the selected cutter is matched, and the cutter can be installed only after the comparison is correct. After installing the cutter, it must be tested by hand. First, turn off the power supply of the terminal machine, press down the touch button, and use a special wrench to shake the master-slave wheel to make the stamping stroke of the terminal machine reach. If the hand does not move, consider whether the pressure is too high or other problems, and check and debug it to OK. Before operation, all locking screws should be checked and confirmed to be free. 4. Pay attention to loading: install the terminal to be punched, adjust the feeding pressure plate with the Allen wrench so that the terminal can easily pass through, visually check whether the feeding position is appropriate, if not, adjust it, use the Allen wrench to loosen the locking screw of the feeder, twist the adjusting lever to adjust it until it is in a good state, then lock the locking screw of the feeder and start the operation. 5. Test the tension: After the machine is adjusted OK, take the waste wire for trial play and conduct the tension test. See the Tension Test Comparison Table for the main reference values. The specific operation method is as follows: press the tension test zero key to adjust it to zero, clamp the terminal wire to be tested, and test it. If the measured tension is not within the standard range, ask the mechanic to readjust it until it reaches the standard value. 6. After the trial production of 10PCS, send it to IPQC for the first article confirmation and the inspection is OK, then mass production can be carried out. During the production process, the operator must self-check whether there are any defects such as rubber coating and neck hanging, and conduct a terminal tension test every hour. 7. After the production is completed, sort out the good products and waste products, and clean up the environmental sanitation around the machine.