Regarding the operation of automatic terminal machine, the operator must first understand some basic characteristics of the machine, and the correct use can ensure the production efficiency and effectively ensure its service life. 1, open the automatic terminal power switch, power indicator. 2. Pay attention to whether there is any obvious abnormal sound inside and outside the machine. If there is any suspension of operation, ask the mechanic to determine whether maintenance is needed. 3. Knife selection and mounting: It is operated by designated personnel. Before mounting, it is necessary to manually compare whether the selected blades are matched or not. After mounting, it is necessary to use hand testing. First, turn off the power supply of the automatic terminal machine, press down the touch button, and use a special wrench to shake the master-slave wheel to make the stamping stroke of the terminal pressing machine reach. If the hand does not move, consider whether the pressure is too high or other problems, and check and debug it to OK. Before operation, all locking screws should be checked and confirmed to be free. 4. Loading: Install the terminal machine to be punched, adjust the feeding pressure plate with the Allen wrench, so that the automatic terminal machine can easily pass through, visually check whether the feeding position is appropriate, if not, adjust it, use the Allen wrench to loosen the locking screw of the feeder, twist the adjusting lever to adjust it until it is in a good state, then lock the locking screw of the feeder and start the operation. 5. Test the tension: After the machine is adjusted OK, take the waste wire for trial play and conduct the tension test. See the Tension Test Comparison Table for the main reference values. The specific operation method is as follows: press the tension test zero key to adjust it to zero, clamp the terminal wire to be tested, and test it. If the measured tension is not within the standard range, ask the mechanic to readjust it until it reaches the standard value. 6. After the trial production of 10PCS, send it to IPQC for the first article confirmation and the inspection is OK, then mass production can be carried out. During the production process, the operator must self-check whether there are any defects such as rubber coating and neck hanging on the terminals, and conduct a terminal tension test every hour. 7. After the production is completed, sort out the good products and waste products, and clean up the environmental sanitation around the automatic terminal machine.